Web Design
What Happens in a Web Design Project, Step by Step
The phases of a web design project, what you decide and receive in each, and where projects stall: discovery, structure, design, build, content, QA and launch.
A web design project looks mysterious from the outside: you brief someone and later a site appears. Knowing the phases, what you are asked to decide in each and what you should receive makes the process easier to manage, and makes delays easier to spot. The names differ between studios; the sequence is similar.
The short answer: a typical project runs through discovery, structure, design, build, content, testing and launch. Each phase should end with something you can approve. The usual causes of delay are late content, unclear approvers and scope changes after design.
A disclosure: Biply designs and builds websites, so this is also a description of how projects like ours generally run. It does not describe a fixed Biply process or timeline.
Phase by phase
| Phase | What happens | You decide | You receive |
|---|---|---|---|
| 1. Discovery | Goals, audience, constraints, current site review | What success looks like; who approves | A written brief or summary |
| 2. Structure | Sitemap, page types, content outline | Which pages exist and what each is for | Sitemap and page outlines |
| 3. Design | Layouts for key pages, visual direction | Look and feel; trade-offs | Design for key templates |
| 4. Build | Development of templates, CMS and integrations | Platform and integration choices (usually earlier) | A staging site |
| 5. Content | Writing, editing, images, migration | Copy sign-off | Final content in place |
| 6. Testing | Devices, browsers, forms, accessibility, speed, tracking | Which issues block launch | A list of issues and fixes |
| 7. Launch | Go-live, redirects, analytics, Search Console | Go or no-go | A live site and a launch checklist |
| 8. After launch | Monitoring and support | Support arrangement | Fixes and reports |
Decisions about motion belong in the design phase: see motion and scroll animation on business websites.
What each phase should produce
- Discovery: a shared description of the goal, audience, scope and risks. If the site already has traffic, an inventory of current URLs and which ones matter.
- Structure: a sitemap and a purpose for every page. Missing purposes show up later as thin pages.
- Design: designs for the templates that repeat, not every page. You should be able to say what you would change and why.
- Build: a working site you can click through, not screenshots.
- Content: the slowest phase in most projects. If you are writing, the date matters more than the quality of the first draft.
- Testing: real devices, real forms. A target such as WCAG 2.2 level AA should be named earlier and tested here.
- Launch: redirects live, tracking confirmed, nothing accidentally blocked.
A decision log keeps projects moving
Keep a one-page log from day one with four columns: the decision, who made it, the date and what it affects. Typical entries are the platform choice, the target accessibility level, the final sitemap, the redirect rule for retired pages and the go-live date. When feedback later contradicts an earlier decision, the log shows who changed their mind and what it will cost in time. Projects with no log tend to re-open the same questions in each phase.
Where projects stall
- Content arrives late. Design looks finished and the site cannot launch.
- Too many approvers. Feedback contradicts itself and rounds multiply.
- Scope changes after design. New pages and features after layouts are approved cost time.
- Decisions deferred. Platform, integrations and tracking should be settled early.
- Migration left to the end. Redirect planning belongs before development.
Our proposal request guide helps you write the brief that prevents several of these, and the proposal comparison scorecard helps you check that the plan covers each phase.
Migration and search
If the site already ranks, the project is also a migration. Google’s guidance recommends mapping old URLs to their closest equivalents with server-side permanent redirects, advises against sending many old URLs to one irrelevant page and says to expect temporary ranking fluctuation. Plan this with the structure phase, not at launch. See redesigning without losing SEO.
Launch and after
On launch day, confirm that no noindex or robots.txt rule left over from staging blocks the live site, that redirects return the right status and that the sitemap is current; Google lists these among the common problems after site moves. After launch, watch Search Console and analytics, fix what real use reveals and agree who owns changes.
Your role in each phase
- Early: give access, name one decision-maker and agree the content schedule.
- During: respond to reviews inside the agreed window.
- At the end: test the staging site on your own devices, and check the forms yourself.
Questions to ask at the start
- What will we have at the end of each phase?
- Who approves each one, and how long do they have?
- When is content due, and what happens if it is late?
- Who owns redirects, accessibility testing and tracking setup?
- What happens after launch?
Next steps
To talk through a project and how we would run it, see our web design and development service and contact us.
Sources
- Google Search Central, How to move a site
- Google Search Central, Redirects and Google Search
- W3C, Web Content Accessibility Guidelines (WCAG) 2.2
FAQ
Frequently asked questions
What are the stages of a web design project?
Typically discovery, structure and content planning, visual design, development, content entry, testing and launch, followed by monitoring. Names differ between agencies, but each stage should end with something you can review and approve.
What do I need to do during a web design project?
Provide goals and access early, make decisions on time, supply or review content, test the staging site and approve each stage. Delays on the client side are a common reason schedules slip.
Where do web design projects usually get stuck?
Most often at content, at approvals with too many decision-makers and at late changes of scope. Agree who approves each stage and when content is due before design starts.
When is redirect planning done?
Before development, if the site already has pages that rank. A redesign that changes URLs is also a migration, and Google recommends permanent server-side redirects from old URLs to their closest equivalents.
What happens after launch?
Monitoring, fixing issues found in real use and any agreed support. Google lists leftover noindex or robots rules, incorrect redirects and outdated sitemaps among common post-launch problems.
Keep reading
- Web DesignCustom Website vs Template or Website Builder: What Is It Worth?Custom website, template or website builder? A criteria-based guide to when custom design and development pay off and when a simpler route is enough.
- Web DesignDIY Website or Hire a Designer? How to DecideBuild it yourself or hire a designer? A readiness test covering time, complexity, risk and the five things a DIY site must still get right.
- Web DesignHow to Choose a Web Design Agency: Questions That MatterHow to choose a web design agency: what to check in a portfolio, process, platform, SEO and accessibility planning, ownership and contract terms.
