Website Redesign Process: Timeline, Phases and What to Include
How to scope a website redesign for a site that already has traffic: what drives the timeline, what to include, what can be cut and how to phase the work.
A redesign of a site that already has traffic is a different project from a first build. There is existing content to move, URLs to preserve or redirect and a baseline to protect. Scope and timeline questions are really questions about those things.
The short answer: scope a redesign around what exists, not only what is new: inventory, decisions on what stays, redirects, content, tracking, accessibility and testing. Timelines are driven by content readiness, approvals and migration size more than by design hours. We do not give a standard duration because none of the sources we read supports one.
A disclosure: Biply designs and builds websites, so we estimate redesigns for clients. This article does not describe a fixed Biply schedule.
Scope: the list that gets forgotten
Proposals often itemise design and development and leave out the work around them. A complete scope for a site with traffic includes:
| Area | Items |
|---|---|
| Inventory | All current URLs, traffic and links per page, what each page is for |
| Decisions | Keep, rewrite, merge or remove each page |
| Redirects | An old-to-new map, implementation and testing |
| Content | Rewriting, migration, images, who does what |
| Design and build | Templates, CMS, integrations |
| Tracking | Key events, analytics and Search Console set up on the new site |
| Quality | Accessibility target, speed targets, device testing |
| Launch | Checklist, rollback plan, who is on call |
| After launch | Monitoring period and fix budget |
Our redesign guide explains the inventory and redirect steps in detail.
Scope by type of site
These are illustrative patterns, not quotes or durations:
| Site type | What usually dominates the scope |
|---|---|
| Small brochure site (a handful of pages) | Content and messaging; little migration |
| Service business with a blog and a few hundred URLs | Inventory, redirect map and content decisions |
| Catalogue or large content site | Templates, structured content and migration testing |
| Site with logins, bookings or integrations | Functionality, security and testing of each integration |
Ask a supplier which row you are in, and why. If the answer does not change the proposal, it was not scoped to your site.
A schedule risk register
Write these down at kickoff, with an owner for each:
- Content not final when design is approved. Owner: you. Mitigation: a content due date tied to the design review.
- A late stakeholder joins. Owner: you. Mitigation: name every approver at the start.
- Integration access delayed. Owner: you and the supplier. Mitigation: request credentials in week one.
- Redirect map incomplete at launch. Owner: the supplier. Mitigation: a go/no-go check on the top URLs.
- Tracking not verified. Owner: the supplier. Mitigation: a test enquiry before launch.
What drives the timeline
We found no independent source with a standard duration, so think in drivers:
- Content readiness. The most common cause of delay. If copy is not final when design finishes, the site cannot launch.
- Decision-makers and approvals. More approvers mean more rounds and contradictory feedback.
- Unique templates. Ten page types take longer than three.
- Integrations. Each external system adds build and testing time.
- Migration size. Hundreds of URLs need mapping and checking.
- Dependencies on you. Access, assets, legal review.
Ask each supplier to mark which tasks depend on you and how long you have for each.
What Google says about timing after launch
Google’s guidance on site moves says small to medium sites can take a few weeks for most pages to move, and to expect temporary fluctuation in ranking during the move. It also advises changing only one thing at a time where possible, for example not combining a redesign with a domain change unless you must. Plan your reporting so a dip in the first weeks is not read as failure.
What you can cut, and what you cannot
Can often be phased or trimmed: bespoke illustration, complex animation, extra templates, secondary features.
Should not be cut: the URL inventory, redirects, tracking, accessibility testing and a post-launch review. Cutting these saves little and risks a lot. Google advises permanent redirects when you are sure they will not be reverted and keeping them as long as possible, generally at least a year.
Phasing a redesign
If the site is large or the risk high, phase the work:
- Foundations: inventory, measurement, content plan.
- Core templates: home, main service pages, contact and enquiry flow.
- Secondary templates: articles, case studies, lower-traffic pages.
- Cleanup: redirects reviewed, old pages retired.
Keep URLs stable where possible. A phased approach lets you see what works before committing everything, in line with Nielsen Norman Group’s advice not to make radical changes when minimal adjustments will suffice.
Questions for a supplier
- What is in scope that is not design and development?
- Which tasks depend on us, and by when?
- What does the schedule look like if content arrives late?
- Who owns the redirect map and its testing?
- What is in the post-launch period?
Our proposal comparison scorecard helps you line the answers up, and what happens in a web design project explains the phases themselves.
Next steps
If you are planning a redesign and want to talk scope, see our web design and development service and contact us.
Sources
- Google Search Central, How to move a site
- Google Search Central, Redirects and Google Search
- Nielsen Norman Group, Radical redesign or incremental change? (February 8, 2015)
On preparing the words before design, see content before design.
FAQ
Frequently asked questions
How long does a website redesign take?
It depends on the number of templates, the amount of content, integrations, approvals and whether URLs change. We do not quote a standard duration because we found no independent source for one. Ask each supplier for a schedule with your own dependencies marked, and expect search engines to take a few weeks to move most pages after launch.
What should a website redesign include?
At minimum: an inventory of existing URLs, a plan for what stays, changes or goes, redirects, content migration, tracking, accessibility and speed targets, testing and a post-launch review. Design and development are only part of the scope.
What drives the length of a redesign?
Content readiness, the number of decision-makers, how many unique templates exist, integrations and the size of the migration. Design time is often shorter than the time spent waiting for content and approvals.
Can I redesign in phases?
Yes. Redesigning the highest-impact templates first limits risk and lets you learn before committing to the rest. Keep URLs stable where you can and redirect those that change.
How long should I keep redirects after a redesign?
Google advises keeping them as long as possible, generally at least one year, and says to use permanent redirects when you are sure they will not be reverted.
Keep reading
- Web DesignFirst 90 Days After a Website Relaunch: What to MonitorA 30-60-90 day plan for after a website relaunch: what to check in Search Console and analytics, which problems to expect and when a dip is a warning.
- Web DesignHow to Choose a Web Design Agency: Questions That MatterHow to choose a web design agency: what to check in a portfolio, process, platform, SEO and accessibility planning, ownership and contract terms.
- Web DesignHow to Compare Website Redesign Proposals Side by SideTurn redesign proposals into one comparable table: scope, deliverables, redirects, accessibility, ownership, change requests and red flags.